Raise Boring LKAB Kiruna  

Background to the project:
LKAB expands ventilation and material handling underground for continued production

Shaft:
A number of rock shafts in different diameters as well as renovation drilling in concrete-filled shafts.

Performed by rig:
Rhino 2000
Rhino 1289
Epiroc Robbins 123RH