2025-10-05, Kiruna Sweden.
We at Orefields Raise Boring AB are proud to present our latest project – a groundbreaking downreaming assignment that takes our technology to the next level!
- The Project: 3.1 m, vertical downreaming 60 m + reinforcement.
- Innovation: Creating shafts WITHOUT disturbing ongoing production in the underlying tunnels.
- Integrated cuttings management directly at the rig, reducing fresh water consumption.
A big thank you to our team and our partners for making this possible!
If you want to see what our production drilling with Downreaming looks like today, check out the film The Art of Downreaming here!