Aitik, Sverige.
Background to the project:
Boliden needed two vertical shafts to create a new pumping station.
Shaft:
197m Vertical, 5m diameter
197m Vertical, 5m diameter
Performed by rig:
Robbins 123RH
Robbins 83DC (Edilmac dei F.lli Maccabelli s.r.l.)