Boliden Aitik – 2023-2024

Aitik, Sverige.

Background to the project:
Boliden needed two vertical shafts to create a new pumping station.

Shaft:
197m Vertical, 5m diameter

197m Vertical, 5m diameter

Performed by rig:
Robbins 123RH

Robbins 83DC (Edilmac dei F.lli Maccabelli s.r.l.)