Boliden Garpenberg 2022–2023

Background to the project:
Boliden needed three ventilation shafts to continue its operation in the Garpenberg mine.

Shaft:
239m at 90 degrees, 4.5m diameter
231m at 90 degrees, 4.5m diameter
79m at 90 degrees, 3.5m diameter

Performed by rig:
Rhino 2000